Work on the Works - 2
"Drake" is seen passing the works yard. The buildings and water tower are all now fixed down, a yard gate has also been made, and also a diesel pump for fuel which was added to the old Hornby tank wagon.We use the tall 5 - 7" Woodland Scenics Tree Armatures for small moorland trees, however for O gauge they really do not have enough branches. I thought about extending each branch if I could. I used some green garden twine cut into short lengths and untwisted the very end of each section to five me 3 or 4 extra branches. They were glued to each and every branch of the armature with UHU. When dry, I stiffened them with p.v.a. with a little acrylic black paint added, which also helps to tone them down. Then I added the foliage.right-hand end. A curved 6mm high platform made of ply-wood was cut to the same profile as the track curve and some "stone" card glued around the edge. A short length of rustic fencing was added (made by Renedra No. RN14, grey) and a simple shelter. The shelter has a shell of 5mm foamboard with Slaters large stone courses added and a roof using Wills Corrugated Asbestos. A wooden bench was also made with plasticard for luxurious seating.
A small station nameboard needs to be added.
I will have to find what small details I have in stock to place around the layout as the yard especially needs some railway junk.
No comments:
Post a Comment