Layout No. 25
A little more work has been done on "Pye Rigg Works":
Placing the works buildings and testing stock for size and clearances. Two new wagons are seen on the front siding part painted.
The original sidings inside the oval were lifted and the head shunt was extended across the beck to allow another turnout to be laid. A siding was added, and all was re-aligned to fit into the sheds. More electrics and point control have still to be done.
No comments:
Post a Comment