Friday, 27 March 2020

Work in progress March

March 2020

The Minimum Gauge Models Industrial Diesel before couplings and weathering were added.

Another view of the loco, I think it now needs an exhaust too.

Meanwhile.....

I have now added track, point control and wiring to the "hillside" board of the new layout.  The size of  the board is 110cm x 51cm (43" x 20").  The track plan and wiring scheme has also been finally decided for the village board.
     The "hillside" board pictured in the sunshine.

A second bogie coach is also under construction.  Though I'm sure I have a pair of bogies for it somewhere, I have been unable to find them, so another pair of Peco GR-106's are on order.
This bogie coach is again built from Wills sheets and plasticard.

No comments:

Post a Comment